PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing motorized dampers at the 4th floor Facing East.jpg Laying out block at Stair -3 Facing North.jpg Rebar at 1st floor concrete plank (1).jpg Burning steel plate at 4th floor Column line F-K Facing South-West.jpg Core drilled Stair -4 for the sprinkler main raiser Facing North.jpg Installed copper piping at the 3rd floor bathroom Facing North.jpg
Previous pageNext page Laying out block at Stair -3 Facing North
Laying out block at Stair -3 Facing North